• Current Operations 

    ProjectsLink PoliciesX

    Quality PolicyDownload

    Health and Safety PolicyDownload

    Environmental PolicyDownload

  • +971 4 429 8733
  • Contact

    LET'S HEAR FROM YOUX

    ADDRESS Jumeirah Lake Towers, Saba Tower 1
    Suite 2804
    P.O. Box 73171, Dubai, U.A.E. 

    Tel: +971 4 429 8733
    Fax: +971 4 429 8732

    LEAVE A COMMENT



PL Blog

  • Cherrington XL Beach Screener at Island 2

    BY Media PLC | ON Wednesday, June 28, 2017

  • Projects Link Contracting Co. L.L.C. is now in proud ownership of a Cherrington XL Beach Screener towed by a brand new John Deere 105 HP tractor. The Cherrington 4600XL is fast, rugged and dependable with only 3 bearings and no revolving belts, times, or screens with low maintenance and long life. The machine is used for Reprofiling and cleaning eight beaches on Island 2 Development by Meraas. Company invested into purchase of Cherrington XL Beach Screener specific for the purpose and looks forward to similar works in the future

  • Comments

    Post has no comments.

    Post a Comment

    Captcha Image

    Trackback Link

    http://www.projectslink.com/BlogRetrieve.aspx?BlogID=10810&PostID=727983&A=Trackback
    Trackbacks
    Post has no trackbacks.
COPYRIGHT ©PROJECTS LINK 2013. ALL RIGHTS RESERVED.
DESIGNED AND DEVELOPED BY AJ.