LA MER Project, Jumeirah Open Beach

LA MER Project, Jumeirah Open Beach

6 Million Tons of Rock Revetment, 9 Million Cubic Meters of Dredged Material Over 1 Million sq.m of reclammed land under construction

Works included demolition and removal of existing three breakwaters – North Breakwater, South Breakwater and Central Breakwater, and the construction of  rock revetments around the footprint of the new North Peninsula, South Peninsula and the Headland. Rock revetments are being constructed at varying depths of -2.5 up to -12 m Dubai Municipality Datum (DMD). 

Scope includes dredging and reclamation works, beach nourishment and re-profiling. Works are being done using a combination of marine and land access with more than 50 marine units operating at the project site with more than 50 long boom excavators in operation. Rock sizes included 1-500 Kgs Quarry Run, 0.3 - 1 Tons Under Layer, 3- 7 Tons Armour Layer placed to varying sections and transitions.

 

Works includes dredging and reclamation works using burrow areas located more than 25 nautical miles offshore, beach nourishment and re-profiling. Works are being done using a combination of marine and land access with more than 50 marine units operating at the project site with more than 50 long boom excavators in operation.

 

The overall Project Master Plan envisages high quality beach amenities including the Beach Zone, a Leisure and Entertainment Hub at the Centre headland, and a mix of Residential and Hospitality units at the North and South Peninsulas (by others).

 